Summit - Snow King
Summit at Snow King, WY
The Lower Station
Summit at Snow King, WY
The Lower Station
Summit at Snow King, WY
Looking Up The Lift Line
Lift Stats:
Manufacturer:  CTEC
Type:  Double
Installed:  1981
Drive:  At bottom station
Tensioning:  At bottom station 
Motor: N/A HP
Motor rating, continuous: N/A kW
Motor rating, starting:  N/A kW
Haul rope diameter:  N/A
Rope guage:  N/A m
Vertical rise: 1,557 ft / 474.5 m
Inclined length:  3,691 ft / 1,125 m

Speed on line: 

500 fpm / 2.54 m/s
Speed in station: 500 fpm / 2.54 m/s
Number of towers:  N/A
Number of chairs:  N/A
Capacity:  1,125 P/h
Ride time:  7.3 minutes

Chair parking: 

N/A

Other notes: 

N/A
     >