Outpost - Mount Snow |
|
|
|
Lift Stats: |
Manufacturer: | Lift Engineering/Yan/CTEC |
Type: | Triple |
Installed: | 1987 |
Drive: | At Top Station |
Tensioning: | At Bottom Station |
Motor: | N/A HP |
Motor rating, continuous: | N/A kW |
Motor rating, starting: | N/A kW |
Haul rope diameter: | N/A mm |
Rope guage: | N/A m |
Vertical rise: | 1,023 ft / 311.81 m |
Inclined length: | 3,939 ft / 1,200.61 m |
Speed on line: |
500 fpm / 2.54 m/s |
Speed in station: | 500 fpm / 2.54 m/s |
Number of towers: | 16 |
Number of carriers: | 157 pcs. |
Capacity: | N/A P/h |
Ride time: | N/A minutes |
Chair parking: |
N/A |
Other notes: |
This lift never really had a concrete installation date, as it was slowly converted to the lift it is now. Starting in 1987 the current drive and return terminals were installed to replace the Carlevario/Savio double chair, and it was then upgraded to a triple by CTEC with new tower crossarms/sheaves, cable and chairs. |