Southridge - Killington |
Courtesy crazyskier91 |
Courtesy crazyskier91 |
|
|
|
Courtesy crazyskier91 |
Lift Stats: |
Manufacturer: | Lift Engineering/Yan |
Type: | Triple |
Installed: | 1977 |
Drive: | At Top Station |
Tensioning: | At Bottom Station |
Motor: | N/A HP |
Motor rating, continuous: | N/A kW |
Motor rating, starting: | N/A kW |
Haul rope diameter: | N/A mm |
Rope guage: | N/A m |
Vertical rise: | 875 ft / 266.70 m |
Inclined length: | 4,381 ft / 1,335.33 m (Uphill Side), 4,128 ft / 1,258.21 m (Downhill Side) |
Speed on line: |
450 fpm / 2.29 m/s |
Speed in station: | 450 fpm / 2.29 m/s |
Number of towers: | N/A |
Number of carriers: | N/A pcs. |
Capacity: | 1,800 P/h |
Ride time: | N/A minutes |
Chair parking: |
N/A |
Other notes: |
This lift has two lift lines. The uphill line, which is the longer of the two, goes uphill diagonally away from the downhill side and makes a turn, where a midstation was originally planned, but never built. The downhill side is standard and goes straight from top to bottom |