Manufacturer:
|
Lift Engineering (Yan) with Garaventa
CTEC upgrades |
Type:
|
Double |
Installed:
|
1976 |
Drive:
|
In top station |
Tensioning:
|
In bottom station |
Motor: |
N/A HP |
Motor rating, continuous: |
N/A kW |
Motor rating, starting:
|
N/A kW |
Haul
rope diameter: |
N/A mm |
Rope
guage: |
N/A m |
Vertical rise: |
1,479.7 ft / 451 m |
Inclined length:
|
N/A ft / N/A m |
Speed on line:
|
525 fpm / 2.66 m/s |
Speed in station: |
525 fpm / 2.66 m/s |
Number of towers:
|
N/A |
Number
of chairs: |
N/A pcs. |
Capacity:
|
1,200 P/h |
Ride Time: |
N/A minutes |
Chair
parking: |
N/A |
Notes: |
This lift was shortened probably in 1991 when
Payday and Bonanza were installed. |