Sunrise - Mt. Bachelor |
Mt. Bachelor |
|
|
Lift Stats: |
Manufacturer: | Lift Engineering (YAN) |
Type: | Triple |
Installed: | 1982 |
Removed: | 1993 |
Drive: | In bottom station |
Tensioning: | In bottom station |
Motor: | N/A HP |
Motor rating, continuous: | N/A kW |
Motor rating, starting: | N/A kW |
Haul rope diameter: | N/A mm |
Rope guage: | N/A m |
Vertical rise: | 246.42 m |
Inclined length: | 1137.51 m m |
Speed on line: |
N/A m/s |
Speed in station: | N/A m/s |
Number of towers: | N/A |
Number of chairs: | N/A pcs. |
Capacity: | 1,800 P/h |
Ride Time: | N/A minutes |
Chair parking: |
N/A |
Other notes: |
Sunrise triple is converted in 1993 to a high speed quad by Doppelmayr. |