Sunrise Express - Mt. Bachelor |
|
|
|
|
|
|
|
|
|
Lift Stats: |
Manufacturer: | Doppelmayr |
Type: | High-speed quad |
Installed: | 1993 |
Drive: | In top station |
Tensioning: | In bottom station |
Motor: | 300 HP |
Motor rating, continuous: | 195.7 kW |
Motor rating, starting: | 224.84 kW |
Haul rope diameter: | 38 mm |
Rope guage: | 4.8 m |
Vertical rise: | 246.42 m |
Inclined length: | 1,137.51 m |
Speed on line: |
4.5 m/s |
Speed in station: | 1 m/s |
Number of towers: | 15 |
Number of chairs: | 68 pcs. |
Capacity: | 2,200 P/h |
Ride time: | N/A minutes |
Chair parking: |
Manual emergency rail |
Other notes: |
Replaced the Sunrise triple chair. |