Outback Express at Mt. Bachelor
Outback Express at Mt. Bachelor
The Lower Terminal
Outback Express at Mt. Bachelor
The Lift Line
Outback Express at Mt. Bachelor
The Lift Line
Outback Express at Mt. Bachelor
The Lift Line
Outback Express at Mt. Bachelor
The Lift Line
Outback Express at Mt. Bachelor
The Top Terminal
Outback Express at Mt. Bachelor
The Top Terminal
Outback Express at Mt. Bachelor
The Top Terminal
Outback Express at Mt. Bachelor
The Top Terminal
Lift Stats:
Manufacturer:  Doppelmayr
Type:  High speed quad
Installed:  1987
Drive:  In top terminal
Tensioning:  In bottom terminal  
Motor rating continous: N/A kW
Motor rating starting:  N/A kW
Haul rope diameter:  N/A mm 
Rope guage:  4.8 m
Vertical rise: 1,780 ft
Inclined length:  N/A m

Speed on line: 

4.5 m/s 
Speed in station: 1 m/s
Number of towers:  23
Number of chairs:  178 pcs.
Capacity:  2400 P/h

Chair parking: 

Manual emergency rail 
     Close Window