Mt. Hood Express - Mt. Hood Meadows
Mt. Hood Express at Mt. Hood Meadows
The Lower Station
Mt. Hood Express at Mt. Hood Meadows
The Lower Station
Mt. Hood Express at Mt. Hood Meadows
Hydrolic Height Adjustment
Mt. Hood Express at Mt. Hood Meadows
Maintenance Carriage
Mt. Hood Express at Mt. Hood Meadows
The Operator Controls
Mt. Hood Express at Mt. Hood Meadows
The Lift Line
Mt. Hood Express at Mt. Hood Meadows
Sheave Train
Mt. Hood Express at Mt. Hood Meadows
The Lift Line
Mt. Hood Express at Mt. Hood Meadows
The Top Station
Mt. Hood Express at Mt. Hood Meadows
The Top Station
Mt. Hood Express at Mt. Hood Meadows
The Top Station
 
Lift Stats:
Manufacturer:  POMA
Type:  High-speed quad
Installed:  1994
Drive:  In top station
Tensioning:  In bottom station 
Motor: 600 HP
Motor rating, continuous: N/A kW
Motor rating, starting:  N/A kW
Haul rope diameter:  N/A mm 
Rope guage:  4.8 m
Vertical rise: 465 m
Inclined length:  1,756 m

Speed on line: 

5.08 m/s 
Speed in station: 1 m/s
Number of towers:  15
Number of chairs:  N/A pcs.
Capacity:  2,800 P/h
Ride time:  4.5 minutes

Chair parking: 

Manual emergency rail

Other notes: 

Replaced the Jacobs Ladder chairlift
     Close Window