North Peak - Loon Mountain
Lincoln Express at Loon Mountain
The Bottom Station
Lincoln Express at Loon Mountain
The Bottom Station
Lincoln Express at Loon Mountain
Doppelmayr DT-104 Grip
Lincoln Express at Loon Mountain
Looking Up the Lift Line
Lincoln Express at Loon Mountain
Looking Up the Lift Line
Lincoln Express at Loon Mountain
Looking Down the Lift Line
Lincoln Express at Loon Mountain
Looking Down the Lift Line
Lincoln Express at Loon Mountain
Looking Up the Lift Line
Lincoln Express at Loon Mountain
The Top Station
Lift Stats:
Manufacturer:  Doppelmayr CTEC
Type:  High-Speed Quad
Installed:  2007
Drive:  At bottom station
Tensioning:  At top station 
Motor: 900 HP
Motor rating, continuous: N/A kW
Motor rating, starting:  N/A kW
Haul rope diameter:  41 mm 
Rope guage:  4.8 m
Vertical rise: 1,475 ft / 476.40 m
Inclined length:  5,474 ft / 1,469.14 m

Speed on line: 

1,000 fpm / 5.08 m/s 
Speed in station: 3.02 fps / 1 m/s
Number of towers:  21
Number of carriers:  95 (actual), 118 (initial), 139 (design)
Capacity:  2,400 (initial), 2,800 (design) P/h
Ride time:  5.7 minutes

Chair parking: 

20% carrier parking at bottom station

Other notes: 

Carrier maintenance building at bottom station.