Eagle
Peak Accelerator at Willamette Pass, Oregon
By Cameron
H.
Here
are some pictures I took pack in 2002 of the Eagle Peak Accelerator
at Willamette Pass, Oregon being installed. The lift costed $3.5
million and was manufactured by Doppelmayr CTEC and was installed
by Outback Construction of Ashland, Oregon. The Eagle Peak Accelerator's
terminal design is the Garaventa CTEC Steath 3 design. The Eagle
Peak Accelerator is a high-speed six-pack in the winter time and
then converted over to a gondola in the summer.
Links:
Oregon Skyway
Eagle
Peak Accelerator
|
Here
is the bottom terminal of the Eagle Peak Accelerator. Sections
of the terminal still lay on the ground. |
|
Another
shot of the lower terminal of the Eagle Peak Accelerator as
it's being built. The spool of haul rope is seen in front. |
|
Looking
up the lift line from the base of the mountain. |
|
Here
are some finished carriers sitting on the hill waiting to be
put into service. |
|
Here
we see some people constructing the carriers for the lift. |
|
Here
is another shot of the lift line from about 3/4's up the mountain.
You can see the top terminal in the top left corner. |
|
Here
is a picture looking down the lift line from the top termianl. |
|
Here
is a picture of the top return terminal being constructed. |
|
Another
shot of some people working on the top return terminal. |
|
Here
are some pieces of the top terminal waiting to be airlifted
to the top as they sit in the parking lot. |
|
Looking
down the brake rail of the lift. |
|
Here
is the 800 HP motor which powers the lift. |
|
Another
picture of the lift's motor. |
For
more information about Willamette Pass:
Visit
its website at: www.willamettepass.com
|