Went skiing at Bretton Woods, NH this weekend. They have a base-to-summit Gondola in the works for the Mount Rosebrook side of the mountain. The B-chair (70's Heron Double) has been removed.
On the map - Where the Gondola is going to go. Notice the truncated Fabyan's Triple (it used to unload into High Ridge). Thought I was losing my marbles when I was skating across High Ridge and the upper terminal was not where I thought it was. [Image source : Skimap.org higher res at - https://skimap.org/d.../1541304736.jpg]

Number of downloads: 90
Bottom Terminal : Fresh Dopp Hardware

Number of downloads: 145
Bottom Terminal From The Hill

Number of downloads: 153
Tower Footing As Seen From Bethlehem Express

Number of downloads: 146
Presumably Another Footing, Covered In Snow

Number of downloads: 141
Presumably Another Footing Covered In Snow (I'm just going off the orange ropes) Supposedly, this quad is staying in. Doesn't that tower look like it's a bit close? May be perspective.

Number of downloads: 135
Top Terminal - not as finished as bottom terminal

Number of downloads: 136
Something's Being Built Up At The Top

Number of downloads: 126
Fabyan's Triple New Top Station Site

Number of downloads: 112
Top Terminal From Below

Number of downloads: 80
Bretton Woods has more construction pics on their website from the summer & fall. (https://www.brettonw.../Gondola-Photos)
They claim the lift will be capable of 4.9 minute ride times (!!!) [read : Bethlehem express is shorter, and 6.5 minutes] and over 13 mph (1,144 feet/minute) My guess is that won't be the final operating speed, doesn't make a lot of sense to run that fast every day.
I am surprised that the Bethlehem Express is staying in, I figured it would be replaced by the gondola. My guess is it'll probably still operate on weekends.
Article with more details : https://www.conwayda...48d72a1ec8.html
This post has been edited by NHskier13: 17 March 2019 - 07:48 PM