boardski, on Jun 22 2005, 06:20 PM, said:
The old Centennial #6 (the lower portion) was moved to create the Rose Bowl lift #4 in 1986 when Centennial Express was installed and extended to reach Spruce Saddle (running length of both lifts 6&7) Lift #7 (the Upper lift "Half Hitch) was moved to Vail in 1992 to create Lift #17. From 1986 to 1992, it was rarely operated except sometimes on weekends. I used to ride it when it was operating to ski laps on Tombstone Gulch and some of the other steeper sections off upper Centennial but I knew it would be gone one day so I had better enjoy it.
<{POST_SNAPBACK}>
Incidently, the former lift #17 at Vail ran nowhere near the current lift #17, it was a Yan double running paralell to the former Avanti #2, another Yan double which both operated from 1976 to 1989 when the current Avanti Express lift (Doppelmayr HSQ) was installed replacing both. Vail's lift#2 ended up at Beaver Creek to create their lift #2 (Highlands) in 1989. Unsure what happend to Vail's old #17, probably sold to another area.