

Possible new lifts for Summer 2006
#83
Posted 15 March 2006 - 03:33 PM
johnny j, on Mar 15 2006, 04:09 PM, said:
Yes John...that's correct. Here's a link to Mad River's site with some install shots...I drove up there last year and saw all the old carriers too...but I dunno if they'll use them unless they can find like 85 more CTEC fixed triple chairs.
http://madriverlifts...r-park-city.htm
#84
Posted 15 March 2006 - 04:24 PM
"We are sorry to report that the Dream Lift has had a major bearing go out and will be down for the remainder of the season. The Triple is running with limited acess by traversing from the top of the Face Lift. This traverse is only recommended for advanced skiers in good physical condition."
I wonder if they just gave up on it since it is probably going to be replaced with a high speed quad this summer.
Liftblog.com
#86
Posted 17 March 2006 - 03:02 PM
#87
Posted 18 March 2006 - 10:33 AM
New Quad Chairlift on Tod Mountain
A new quad chairlift on Tod Mountain will provide direct and faster return access to popular runs like Chute, Spillway, Green Door, Cariboo, Bluff and many others. The lift will provide another route to the top of Tod Mountain as well as the Nancy Greene International Race Centre, home to the Austrian Ski Team for early season race training through the 2010 Olympic Games.
Liftblog.com
#88
Posted 18 March 2006 - 11:44 AM
Heres a possible liftline map
Attached File(s)
-
SunPeaksNewLiftline.jpg (198.4K)
Number of downloads: 107
#89
Posted 18 March 2006 - 11:45 AM
Skier, on Mar 18 2006, 01:33 PM, said:
New Quad Chairlift on Tod Mountain
A new quad chairlift on Tod Mountain will provide direct and faster return access to popular runs like Chute, Spillway, Green Door, Cariboo, Bluff and many others. The lift will provide another route to the top of Tod Mountain as well as the Nancy Greene International Race Centre, home to the Austrian Ski Team for early season race training through the 2010 Olympic Games.
Are they taking out the Crystal Chair to do that?
#92
Posted 18 March 2006 - 09:39 PM
WBSKI, the Sun Peaks article was on www.firsttracksonline.com go to "ski news"
SkiBachelor - can you post the old sun peaks trail map?
Attached File(s)
-
WhistlersFluteBasinCAN.jpg (1.2MB)
Number of downloads: 75
This post has been edited by Skier: 18 March 2006 - 09:41 PM
Liftblog.com
#94
Posted 19 March 2006 - 01:54 PM

Number of downloads: 55
#96
Posted 21 March 2006 - 02:37 PM
The Teocalli Bowl Lift will not be happening this year.
By 2006-2007 (NEXT season)....
The East River Lift, the double turned triple on the backside of the mountain, will be getting replaced with a high speed quad. I dont know who theyre in contract with (they are) to purchase the lift, but I would bet its Leitner Poma, as all the rest of the lifts for CB have come from them. There will be expanded snowmaking and tree cutting in this area too. It will turn a seven minute ride into a 3 minute ride.
By 2007-2008....
+ A new lodge at the top of Keystone/Red Lady Express called Red Lady Lodge.
+ Teocalli Bowl Lift will NOT be a t-bar as announced, but instead will be a triple chair using parts from the Gold Link and Painter Boy Chairs. These chairs are set to be "updated" as well, although I suspect it will just be new chairs and bullwheels and such; i doubt they will put in high speeds here as they are just too short. A HSQ on Painter Boy would be like a 30 second ride.
Down the road..
+ Some minor work will be done to Silver Queen Road to make Paradise accessible from Twister, and on the Canaan Terrain Park trail itself.
+ Work on the icy "luge" exit from Banana and Peel.
+ Regrading of several trails.
+ Re-alignment of Teocalli Lift so that it unloads at Red Lady Lodge.
+ Re-alignment of High Lift, and the move of Ski Patrol Headquarters from the bottom of that to the top of the Silver Queen.
+ Re-alignment and work to the Peachtree Lift area.
+ Snodgrass Lite maybe as early as 2009.
now, crested butte has had a great year. theres been lots of guests and the snow has been consistent and good. the numbers are looking good for a good profit, and that will help motivate the local buearacray to action, so you might end up seeing some of this earlier than planned, but this is a rough timetable.
This info was taken from an article written by Laura Freeman in the cb news. http://www.crestedbuttenews.com for the article, or if you want to see cb's plan for yourself, go to http://www.skicb.com/masterplan.
#97
Posted 24 March 2006 - 09:29 AM
Brad Baker, Silver Star's Operations Manager, reports that the new Alpine Meadows chairlift at Silver Star will offer improved access to all of the runs to the west (skier's right) of the Summit chair, and adds that "this was Silver Star’s black diamond terrain prior to Putnam Creek. It is well known by locals for great powder lines. It is south facing so it offers great spring skiing and panoramic views down the valley. The Alpine Meadows chair will make this terrain truly lift-serviced for the first time ever."
#99
Posted 24 March 2006 - 11:53 AM
#100
Posted 24 March 2006 - 06:48 PM
vons, on Mar 24 2006, 12:53 PM, said:
I like that Lift Terminal :)
12 User(s) are reading this topic
0 members, 12 guests, 0 anonymous users