RibStaThiok, on 13 October 2018 - 09:17 PM, said:
A lot of us can't wait for it to be finished and put into service. How long has it been since it was removed from Stratton?
The old betwixt lift was removed from Stratton in 1995. so that would mean t has been sitting idle for 23 years. Quite a while to say the least.
Here are my pics of from this summer 2018:
mag20.jpg (92.93K)
Number of downloads: 74
Rebuilt sheaves hung on tower 1.
mag21.jpg (132.99K)
Number of downloads: 91
tower 2 getting ready for sheaves.
mag22.jpg (123.53K)
Number of downloads: 87
sheaves hung on tower 2.
mag23.jpg (220.3K)
Number of downloads: 86
8 wheel rocker ready for installation. pretty sure this is the portal assembly for the light side.
mag24.jpg (225.98K)
Number of downloads: 86
Return bullwheel getting ready for installation.
mag25.jpg (153.07K)
Number of downloads: 88
bottom terminal with haul rope hung.
mag26.jpg (151.08K)
Number of downloads: 89
haul rope now up.
mag27.jpg (120.51K)
Number of downloads: 94
Portal assemblies.
mag28.jpg (118.51K)
Number of downloads: 109
looking up the line with haul rope.
mag29.jpg (145.73K)
Number of downloads: 94
This is the most recent photo I have taken (oct 9). It shows the motor room has been put up although missing some windows yet. The idler terminal sheaves were also installed since my last visit.