Posted 20 October 2017 - 07:15 AM
Adding to other posters good information – most towers and terminals would stand all by themselves if no cable weight or tension was applied.
In simplistic engineering terms the concrete acts like the sand at the base in tackling dummies.
Tackle-dummy.jpg (95.7K)
Number of downloads: 8
In simplistic engineering terms the concrete acts like the sand at the base in tackling dummies.

Number of downloads: 8
www.ropetech.org
#6
Posted 21 October 2017 - 01:21 PM
Kelly, on 20 October 2017 - 07:15 AM, said:
Adding to other posters good information – most towers and terminals would stand all by themselves if no cable weight or tension was applied.
In simplistic engineering terms the concrete acts like the sand at the base in tackling dummies.
Tackle-dummy.jpg
In simplistic engineering terms the concrete acts like the sand at the base in tackling dummies.

Thank you for the infomation Kelly!
#7
Posted 21 October 2017 - 04:24 PM
As noted above, it depends entirely on the mixture used.
Most construction projects use concrete that takes days (like stated above, 5-7 days) to fully cure.
Sometime you can get a faster cure, for example, when they rebuilt I-85 in Atlanta after the bridge fire last spring, they used a fast-cure concrete (basically like QuikCrete at Home Depot, but in vastly larger quantities), and rebuilt the entire bridge (six lanes per side x 300 feet long) in 41 days.
If you wanted to spend the money, there's no reason you can't pour a foundation for a lift that'll cure just as fast.
Most construction projects use concrete that takes days (like stated above, 5-7 days) to fully cure.
Sometime you can get a faster cure, for example, when they rebuilt I-85 in Atlanta after the bridge fire last spring, they used a fast-cure concrete (basically like QuikCrete at Home Depot, but in vastly larger quantities), and rebuilt the entire bridge (six lanes per side x 300 feet long) in 41 days.
If you wanted to spend the money, there's no reason you can't pour a foundation for a lift that'll cure just as fast.