julestheshiba, on 25 May 2016 - 05:50 AM, said:
NHskier13, on 25 May 2016 - 08:14 AM, said:
julestheshiba, on 25 May 2016 - 08:36 AM, said:
I think the solution here is to either repair it as stated or completely install a new drive terminal (that thing has endured 40 years, the only way I could see that operating for another 15 would be newer technology installed at the base. Possibly replace Snowbowl with an HS and just transfer over the alpha drive. I really love that house type drive, but money needs to be put into the base terminal somehow or another.
As for the racing poma, it depends on usage. If Snowbowl HS happens, keep it there and if it goes down have racers cut line on HS. If it will cost too much to repair, replace.
I really doubt the solution to the Borvig is replacing the lift entirely, because everything else (Towers, return, chairs, sheaves, chair backrests, safety bars, bullwheels, grips etc.) are in awesome condition. Here's a pic of the return:
