I was just wondering something. When a lift is installed at a resort what goes up first? Could you make a list? Also when they install the bullwheel and the drive, do they put the wheel in with the gearbox or both separately? I say this because I see lifts delivered with the bullwheel and the gearbox connected. Is the installation different for express lifts?
Don't get rid of something before you know how much it is worth.
-Will
-Will
#2
Posted 12 May 2016 - 05:23 AM
Generally speaking the concrete goes in first
. From there, the schedule is usually dependent on the availability of parts and other contractors. Helicopters can be the tough ones to schedule, so you tend to schedule around them. For a drive bullwheel there is quite a bit of work with fitting and alignment of the bullwheel, gearbox, motors(s) etc. A shop environment is better suited for this kind of work, and relieves some of the work load on site.

#3
Posted 12 May 2016 - 05:40 AM
JSteigs, on 12 May 2016 - 05:23 AM, said:
Generally speaking the concrete goes in first
. From there, the schedule is usually dependent on the availability of parts and other contractors. Helicopters can be the tough ones to schedule, so you tend to schedule around them. For a drive bullwheel there is quite a bit of work with fitting and alignment of the bullwheel, gearbox, motors(s) etc. A shop environment is better suited for this kind of work, and relieves some of the work load on site.

Thank you.
Don't get rid of something before you know how much it is worth.
-Will
-Will
#6
Posted 12 May 2016 - 09:24 AM
I would guess yes if you add a mid station. You would just need a second set of track ropes
The Ski Lift Enthusiast
http://sugarloafphotos.blogspot.com/
http://sugarloafphotos.blogspot.com/
#7
Posted 12 May 2016 - 12:32 PM
NHskier13, on 12 May 2016 - 08:08 AM, said:
Speaking of the topic, how exactly do they make a perfectly straight line up something long and with uneven ground, the mountain? From what I can tell I think sometimes terminals are built first then towers later.
Accurate surveying
Anything is possible when you don't understand what you are talking about.