Lift Construction Photos 2015
#161
Posted 12 September 2015 - 01:32 PM
#162
Posted 12 September 2015 - 04:49 PM

Number of downloads: 97
https://www.youtube....TimeQueenOfRome
#163
Posted 13 September 2015 - 07:18 AM
https://skiliftblog....09/img_4155.jpg
West Palm Beach, FL - elev. 9 feet
#164
Posted 13 September 2015 - 10:44 AM
floridaskier, on 13 September 2015 - 07:18 AM, said:
https://skiliftblog....09/img_4155.jpg
King Con will also have Agamatic grips. You can see the grip rails a bit more easily in this photo:

https://www.youtube....TimeQueenOfRome
#165
Posted 14 September 2015 - 07:08 PM
Video from their Facebook page: https://video-ord1-1...998&oe=55F7AFFB
#166
Posted 18 September 2015 - 04:12 PM

Number of downloads: 79
https://www.youtube....TimeQueenOfRome
#168
Posted 19 September 2015 - 01:47 PM
Replacing original Riblet vault drive with used Ctec drive.
Winters coming!
Attached File(s)
-
WP_20150919_15_05_31_Pro.jpg (993.34K)
Number of downloads: 129 -
WP_20150919_15_10_25_Pro.jpg (1.02MB)
Number of downloads: 140
#169
Posted 19 September 2015 - 01:52 PM
You know, I keep thinking that the new Avanti Express lift has two hold-down towers where the original only had one because of the shorter terminal length. Correct me if I'm wrong, but is the UNI terminal (the new design) shorter than the CLD terminal (the original's design)?
https://www.youtube....TimeQueenOfRome
#170
Posted 20 September 2015 - 10:01 AM
William Shakespeare
#171
Posted 20 September 2015 - 05:36 PM
hoodoo, on 20 September 2015 - 10:01 AM, said:
I have to toe the company line on this one!
Snippet from media release:
In consultation with Leitner-Poma Lifts, the original manufacturer of the Grey Mountain Chairlift, RED Mountain has authorized modification of the Grey Mountain lift towers. The modification will effectively lower the lift profile by reducing overall tower height.
The work is expected to begin on September 9 and take approximately eight weeks to complete. The lift will be in operation for the upcoming 2015-16 ski season.
#173
Posted 20 September 2015 - 08:36 PM
https://www.youtube....TimeQueenOfRome
#174
Posted 21 September 2015 - 08:28 AM

Number of downloads: 50
https://www.youtube....TimeQueenOfRome
#175
Posted 21 September 2015 - 01:37 PM

https://www.youtube....TimeQueenOfRome
#176
Posted 22 September 2015 - 01:26 PM
DonaldMReif, on 20 September 2015 - 08:36 PM, said:
#177
Posted 22 September 2015 - 06:45 PM
DonaldMReif, on 20 September 2015 - 08:36 PM, said:
They are replacing all of the chairs with bubbles. The old chairs could possibly be going over to the new lift on the development side of the mountain. (not sure)
Is it common for mountains to change to bubbles halfway through the lift's lifespan?
#179
Posted 29 September 2015 - 06:37 PM
They just poured concrete yesterday at the bottom terminal and it appears that much of the top terminal is now complete.
Attached File(s)
-
12010637_10153249316419372_4346234168374252635_o.jpg (350.14K)
Number of downloads: 135 -
12029716_10153249316409372_1576860656112361292_o.jpg (409.81K)
Number of downloads: 188 -
12079861_10153249316404372_5138905262694501968_o.jpg (403.06K)
Number of downloads: 187 -
12087309_10153249316424372_9080276470965994728_o.jpg (362.7K)
Number of downloads: 174 -
12087689_10153249316434372_3785774741328072555_o.jpg (592.22K)
Number of downloads: 125
#180
Posted 04 October 2015 - 12:47 PM

Number of downloads: 96
https://www.youtube....TimeQueenOfRome
28 User(s) are reading this topic