Jump to content


- - - - -

Spruce Triple Bottom Station



  • Views: 1484

    The Spruce chair was in process of construction in 1986 by Riblet. In 1987, Doppelmayr finished building the lift. From what I can tell, the drive and the stations are from Riblet, everything else is Doppelmayr.